Slabs at ground level
Hickory Hills Concrete Flatwork and Pads
Small slabs, done properly. Flat, drained and hard on top.
Small Slab, Same Rules
A shed pad looks simple. So does a strip beside the garage. Most of them fail anyway. They rock. They tilt toward the house. They hold a puddle. They shed their top in flakes. The reason is nearly always the same: nobody dealt with the ground. Here is what we do instead. Dig out the topsoil and soft clay. Lay crushed stone and pack it with a plate compactor, more than one pass. Stake the forms so the slab falls gently toward a safe spot. Add mesh or bar if the slab will carry weight. Pour, finish with a texture that suits the use, and cut control joints before shrinkage cracks show up on their own. Then cover it and keep it damp so the surface cures hard. One crew lead handles all of it and answers your calls the whole way through. Plenty of Hickory Hills yards slope, so we check the grade carefully before setting a single board.
Every Flatwork Job Includes
Size varies. The groundwork does not.
Measure and mark
Slab outline set on the ground with you, so size and spot are agreed.
Old slab out
Tired concrete jackhammered and carted away.
Dig to firm ground
Soft soil removed until the bottom can carry load.
Compacted stone
Crushed stone tamped in passes. Not just raked flat.
Planned runoff
Forms set with a slight fall toward a safe outlet.
Steel if needed
Mesh or bar where weight or soft soil calls for it.
Joints cut early
Control joints placed before random cracks can form.
Covered cure
Slab kept damp under cover so the top stays dense.
How It Goes
Look and price
The crew lead comes out, measures and checks drainage. You get a written price with depth, stone, finish and removal listed.
Prep
Removal, digging, stone compacted, forms staked to grade, steel placed if the slab needs it.
Pour and cure
Concrete placed and textured, joints cut, slab covered while it hardens. Forms pulled and edges filled with soil.
Why Our Pads Stay Put
Base first
Packed stone is what keeps a pad from tipping and settling.
Water has an exit
Every slab is graded to drain. None toward your foundation.
Someone answers
Questions go to the crew lead directly. Calls get returned.
- Stone packed in passes
- Graded to an outlet
- Joints placed early
- Damp-cured surface
Pad for a Shed or AC Unit?
Tell the crew lead what will sit on it and roughly how big. He will size the slab and set a day to look at the ground.